Soladek

Rib Height:   23mm
Soladek

Our new age Soladek roofing panel has been specifically designed for use in
conjunction with the latest solar electricity generating panels.

The wide flat pan allows for flush mounting of thin photovoltaic laminate (PVL) panels eliminating the need for bulky glass solar panels and corresponding brackets and roof penetrations. The result is an aesthetically pleasing roof with free solar electricity and a corresponding reduction in greenhouse gases.


Maximum Span Tables - (Approx Only)
BMT
 
MASS
KG/M2

COVER
(MM)

ROOF
INTERNAL
ROOF
END
ROOF
PITCH
0.55 5.7 460 600 600 5 deg

RECOMMENDED FIXING METHOD
Supporting roof battens (40mm x 0.55mm bmt hitensile steel) to be installed at maximum 600mm spacings
Fasteners to comply with AS3566-class3.
Crest fix at each support using Tek12 x 45mm Hex Head with seal washer.

Soladek

ADVERSE CONDITIONS
If material is to be used within 1km of salt marine, industrial or corrosive environments please contact our Apex sales staff.

WARRANTIES
Our products are supported by Bluescope Steel Limited and a full warranty is available.

LENGTHS / TRANSPORT
Apex Building Products can custom cut lengths to your requirements. Due to transport restrictions it is advisable to check with our office the maximum length.

HANDLING
Care should be taken at all times when handling Corrugated. Packs must be kept dry and stored above ground level, should the sheets become wet separate immediately and individually wipe and place in an area to dry.

COMPATIBILITY
ZINCALUME® steel sheeting is compatible with most roofing products. It is NOT recommended to use lead flashing/nails, copper or copper alloy materials with or in run-off situations.

CUTTING
Apex Building Products provides this service, however sheets may be cut using a power saw with a metal cutting blade. COLORBOND® steel sheeting must be cut with the coloured surface facing the ground. Ensure that no hot particles or debris come into contact with the COLORBOND® .

CLEAN UP
To prevent premature corrosion at the completion of each day ensure the sheeting area is cleared of all debris, including nails, rivets, rags and all cutting or drilling filings.

DELIVERY
Apex Building Products delivers to site within 1 to 2 days. To prevent any damage we require suitable arrangements to be made for unloading. Unloading by crane, ensure the load is evenly spread, if crane unavailable adequate manpower is required.